Allow List at DK progress

At the end of the day Tuesday we have 258/437 IPs used at DK on the trusted network with the change over to the allow list. 40% available is excellent where quite often before this would be in single digits or at zero! The lease times have been reset to 7 days. This should help out quite a bit with teachers wanting to use remote desktop as a tool in class.

The SD60-Public network had 184 users Tuesday. 442 devices on networks.

Wednesday traffic graphs look good below. Much more bandwidth available and being used by the trusted side of the network. Limits on SD60-Public network are working well. Near the end of the day on Wednesday we have 319/437 IP leases in use on the trusted network. 256 leases on the SD60-Public network. 575 devices with leases on networks.

Left side graphs are the trusted network, right side the sd60-public network
Left side graphs are the trusted network, right side the sd60-public network

 

 

 

 

 

 

Thursday we are up to 335/437 IP leases used on the trusted network. The public side has 284 devices. 619 devices with leases on networks. If we reach 100% on the trusted side we would need to lower the lease time allowed as some of these will not be active devices holding leases (ie visiting itinerants etc)

Friday we are up to 349/437 IP leases on the trusted network. 276 Devices on the Public side as their shorter lease times resulted in fewer overall compared to yesterday. We will continue to monitor next week to make sure that the seven day lease on the trusted network does not result in 100% use.

Tuesday (23rd) There are 358/437 IP leases used on the trusted network. 18% remaining available. Many leases will be renewed today if the devices are still present. It looks like 7 days will work provided we are not expecting to introduce a significant number of devices on a specific day to the trusted network (like a pro-d day). If that were the case I’d suggest folks connect to the SD60-public network instead who are visiting and can’t get an IP. We could also clear the leases the day of a pro-d with many new users and clear them again afterwards if we are given some notice via a Work Order. The Public side had 272 leases as of this afternoon.